
Residential
Internal Concrete Floor Replacement
Existing floor removed and replaced with a reinforced 150 mm concrete slab.
Guildford
Overview
Overview
Following an investigation into damp, the existing floor was removed and excavated to the required depth.
Solution
Solution
The team installed clean hardcore, sand blinding, a 1200-gauge damp-proof membrane, A393 mesh and a new 150 mm concrete slab.
Outcome
Outcome
The dig-out, installation and concrete pour were completed in just over a day.
Gallery






Have a Similar Project?
Tell us about your requirements and we'll provide a detailed quotation.
